Wellington
Registration is only available for current members.
Te Ara Tupua will improve transport resilience and create a walking and cycling link between Wellington and Lower Hutt. Delivering a safe route connecting more people to transport options in both Wellington and the Hutt Valley. Construction of the Pito-One to Melling section began in 2019 and was completed in October 2023. The Ngā Ūranga ki Pito-One section will be constructed between 2022 and 2026.
For those catching the train to Petone, don’t forget to look out
for work on the revetment, including sea walls, Xblocks, offshore habitats.
You may like to check out the videos on the Waka Kotahi Website - https://www.nzta.govt.nz/projects/te-ara-tupua/videos/
PPE requirements:
• Hard hat with chin strap (NO RED hats),
• Wrist to ankle cover (no shorts / skirts)
• Hi Viz top – Orange
• Lace up work boots (preferred) – but sturdy closed toe flat shoes are acceptable.
How to get there?
• Travel on the Hutt Valley Line to Petone and take a short walk to the site office
• Car share